 |
• |
 |
Two-story building addition, pre-engineered construction with patterned split face block.
new north entrance, multi-purpose gymnasium area, additional classrooms and computer lab
|
| |
• |
|
This fast track Design-Build project was value-engineered to fit the owner’s budget.
|
| |
• |
|
Building was created for superb practicality; and to accommodate an expanding student population.
|
| |
• |
|
The addition doubled the interior space.
|
| |
• |
|
Design Build collaboration with Wilcon Corp.
|